A wetland isn’t a pipe. Price the repair, not the replacement
Brampton put its wetlands and lakes into its 2025 stormwater asset management plan, three years after leaving them out because staff had no inventory, condition data, or standard way to value them.
- Where
- City of Brampton, Ontario
- Barrier
- Methods
- Trigger
- The city's 2022 stormwater asset management plan left natural assets out because there was no full inventory, no condition assessment, and no standard way to value them
- Tool
- Restoration-based costing for wetlands and lakes, an interim condition rating, and levels of service for natural assets in the stormwater asset management plan
- Asset type
- Wetlands and lakes
- Who did the work
- The city's Corporate Asset Management Office and stormwater staff, with SLBC Advisory Services; Credit Valley Conservation publishes the lifecycle costs staff plan to use
- The number
- $105.67 million in 2024 dollars, the one-time replacement value of 162.8 hectares of wetlands ($69.91 million) and the city's lakes ($35.76 million); about $3.1 million a year in added care the stormwater charge doesn't cover
Why Brampton started
Brampton pays for its storm sewers, ponds, and culverts through a stormwater charge on hard surfaces, in place since June 2020. Its wetlands and lakes slow and clean the same runoff, but they weren't in the city's first stormwater asset management plan, which council approved in 2022. In the 2025 plan, the city explained why: it had no complete inventory, no condition assessments, and no standard method for valuing natural assets, so staff couldn't estimate what they were worth or fit them into the plan.
What Brampton did
For the 2025 plan, staff worked with SLBC Advisory Services and built the inventory from the city's GIS layers. A wetland isn't torn out and rebuilt the way a pipe is, so the city costed wetlands and lakes by what it would take to restore them to working condition, plus a 10 to 15 per cent contingency. That put 162.8 hectares of wetlands at $69.91 million and the lakes at $35.76 million, both one-time replacement values in 2024 dollars. Wetlands have no installation date and little condition data, so staff assumed they are in fair condition and said so in the plan, as a stopgap until they can assess them. The city rated Professor's Lake and Donnelly Lake in very poor condition, and Donnelly Lake's restoration is under way with provincial grants. The city proposed levels of service for natural assets: keep today's wetland area, and good water quality in every lake by 2034, a target staff still have to confirm. Staff estimated the added yearly work, including invasive species control, monthly water sampling, and shoreline repair, at about $3.1 million a year.
What it means for you
Nobody has to wait for a complete method. Cost the asset by what restoring it would take. Record a condition, and say plainly that it's an assumption. Then list the assessments that will replace it. For the costs themselves, Credit Valley Conservation publishes 50-year lifecycle and replacement costs per hectare for 22 natural asset sub-types common in southern Ontario, from 2025 labour and material prices (costs for streams and open water are due in 2026), and shares the spreadsheets on request at naes@cvc.ca.
Where it stands
The city's improvement plan lists what comes next: a condition and performance program for natural assets, a Wetlands Health and Restoration Study, and a shared data dictionary for stormwater and natural assets, with data rules for the GIS and asset management software where staff keep the records. Credit Valley Conservation released updated lifecycle costs in February 2026, in a report dated December 2025, with new costs for several wetland types; staff had planned to draw on them. The $3.1 million a year has no funding source yet, and restoring Professor's Lake is waiting for money.
Where to go next
Each step of Your plan names a method and a free resource for it, many of them from the Natural Assets Initiative's 'Nature is Infrastructure' (2024).
Sources
Your aquifer can do a water plant’s job for $30K a year
British Columbia
How Gibsons budgets for its aquifer
Priorities · MoneyThe woods and wetlands are already handling $585 million worth of stormwater
Ontario
How Pelham priced what it would cost to replace them
Council supportTwo cities, one creek, one price tag
Ontario
How Hamilton and Burlington valued a shared watershed
Methods